Downloads · User Manuals
Operating instructions and experiment procedures.
Download the user manual or datasheet for each instrument we supply. If a specific manual isn’t listed, request it via the contact form.
Optics
Electricity & Magnetism
- MRX-RMN · DatasheetMeasurement of Magnetoresistance in Different Samples (MRX-RMN)
- MRX-RMC · DatasheetMeasurement of Magnetoresistance in Different Samples (MRX-RMC)
- CA-44 · DatasheetApparatus for the Measurement of Susceptibility of Solids by Gouy’s (CA-44)
- GMX-02 · DatasheetApparatus for the Measurement of Susceptibility of Solids by Gouy’s (GMX-02)
Thermodynamics
- HEX-33C · DatasheetDependence of Hall Coefficient on Temperature (HEX-33C)
Modern Physics
Measurement Instruments
Educational Laboratory Equipment
- PN-01 · DatasheetStudy of energy band-gap and diffusion potential of P-N Junctions (PN-01)
- RC-01 · DatasheetStudy of a Transistor Amplifier (RC Coupled) Cum-Feed Back Amplifier (RC-01)
- sku-73 · DatasheetStudy of Characteristics of Semiconductors Diodes Si (Ge: Zener + LED: D-1)
- MD-01 · DatasheetStudy of Modulation & Demodulation with Built-in Carrier Frequency (Solid (MD-01)
- 555 · DatasheetStudy of Astable & Monostable Multivibrators using Timer IC (555)
Research Instruments
- DFP-03 · DatasheetResistivity of Semiconductors by Four Probe Method at Different (DFP-03)
- DFP-RM-200N · DatasheetFour Probe Set-Up for measuring the resistivity of very low to highly (RM-200N)
- DFP-LHN · DatasheetFour Probe measurement set-up for wide range of resistivity samples from (sku-39)
- DFP-LHC · DatasheetFour Probe measurement set-up for wide range of resistivity samples from (sku-40)
- FP-01 · DatasheetFour Probe Set-up for Mapping the Resistivity of Large Samples (FP-01)
- FP-01C · DatasheetFour Probe Set-up for Mapping the Resistivity of Large Samples (FP-01C)
- TPX-200C · DatasheetTwo Probe Method for Resistivity Measurement of Insulators (TPX-200C)
— Begin a project
Equip your laboratory with quality scientific instruments.
Share your tender, syllabus or product list — we’ll respond within one business day with a configured quote, BOM and INCOTERMS proposal.
